Skip to content
Contained, removed and cleared for reentry Open 24/7 (516) 386-4938
Hicksville Asbestos Removal logo
Older brick school building and lawn

City jobs halted over asbestos

DEP Stop Work Order Help From Hicksville

A job in the five boroughs got shut down over asbestos. Paperwork, cleanup and air sampling now have to be done right before DEP will sign off.

A Stopped Job, a Clear Path Back

In the five boroughs, DEP shuts a job down when asbestos gets broken up with no filing on record or no controls set up around it. A demolition crew pulls a ceiling before anyone surveyed it. A renovation opens up pipe wrap that was never on the paperwork. A neighbor or an inspector sees dust and the job gets halted.

These orders are a city matter. They apply to buildings in the five boroughs, not to Hicksville or other Nassau towns, where state asbestos rules apply instead. Still, plenty of property owners and builders who live out here run projects in the city. If one of those sites goes quiet, the phone call usually comes from someone in central Nassau.

Getting an order lifted generally takes three things. The right filings with the city. Abatement of the broken material by a licensed contractor, inside proper containment with air sampling running. Then a DEP review and its sign-off. Nobody can honestly promise you a date for that last step, and we will not. What we can do is make sure every piece in our control is done correctly the first time, so the job is not stuck on a second round of corrections.

What Stop Work Order Help Covers

The pieces needed to move a halted job toward DEP sign-off.

  • Reading the order closely

    What the order cites, which material got broken and the conditions for restarting.

  • Survey and testing

    The affected area surveyed and suspect material sent to an accredited lab.

  • Required filings

    The notifications and paperwork the city expects for the abatement.

  • Licensed abatement

    The broken material sealed in, misted, removed and packed for a permitted dump.

  • Air monitoring

    A third-party firm samples the air throughout, and the clearance results go on file.

  • Documentation for sign-off

    The records DEP will want to see, organized and handed over.

From Stopped to Moving

  1. Send us the order

    Phone in with the order details, the building and what work was underway.

  2. Assess and file

    The area is surveyed and tested, and the required filings are prepared.

  3. Abate under monitoring

    The material is removed under containment with independent air monitoring.

  4. Close it out

    Clearance results and records go together so the job can move toward DEP sign-off.

Why Stopped Jobs Get Handed to Us

  • Used to close inspection

    The company has completed asbestos work on government projects, where procedures and paperwork are checked line by line. A DEP review is familiar ground.

  • No promised dates

    You get an honest picture of the steps, not a timeline nobody controls.

  • Filings and removal together

    One team for the paperwork and the abatement, so nothing falls between two contractors.

  • Citation read line by line
  • Paperwork lined up
  • Third-party air sampling
  • Records ready for DEP

City Job Shut Down Over Asbestos?

Every day it sits costs you. Tell us what DEP cited and where the building is, and we will lay out the path back in plain terms.